• Perform fitting works.
• Install mounting bracket/plate.
• Drill piping hole. Install piping system.
• Install indoor unit. Install outdoor unit.
• Install wiring system.
• Vacuum piping system.
• Perform leak test.
• Charge refrigerant.
• Record air-conditioning installation process.
BAHAGIAN TEKNOLOGI RAC, ADTEC JTM KAMPUS KUALA LUMPUR
01/11/2025 (Saturday) / 08:00 AM
until
09/11/2025 (Sunday) / 04:30 PM
ADTEC JTM KAMPUS KUALA LUMPUR
ADTEC JTM KAMPUS KUALA LUMPUR
32 Jam
Hari Minggu
MYR700.00
No Data
No Data
KURSUS JANGKA PENDEK (MODULAR) | Face to Face
TERBUKA KEPADA ORANG AWAM
0379817495
nuradlina@jtm.gov.my
Update on 2025-11-10 09:06:38