Memproses... Sila tunggu
ILPKL Events Management System ilpKLEMS
poster
THREE PHASE WIRING AND SYSTEM MAINTENANCE
Permohonan Terbuka
Keterangan Aktiviti

  • Prepare three phase wiring requirements.
  • Perform three phase wiring activities.
  • Carry out three phase distribution board installation.
  • Prepare maintenance work requirement.
  • Perform maintenance work.
  • Prepare maintenance work report.


Penceramah
image
SUHAIZAM ARIF BIN SULAIMAN
PENOLONG PEGAWAI LATIHAN VOKASIONAL
image
NOORAZURA MAT SHADAN
PENOLONG PEGAWAI LATIHAN VOKASIONAL
image
ROHAYA BINTI YAACOB
PENOLONG PEGAWAI LATIHAN VOKASIONAL
Anjuran

BAHAGIAN TEKNOLOGI ELEKTRIK, ILP KUALA LUMPUR

Tarikh / Masa

05/07/2025 (Sabtu) / 08:00 Pagi
hingga
19/07/2025 (Sabtu) / 04:30 Petang

Lokasi

INSTITUT LATIHAN PERINDUSTRIAN KUALA LUMPUR
JALAN KUCHAI LAMA, KUALA LUMPUR

Tempoh

40 Jam

Waktu Latihan

Hari Minggu

Bayaran

RM850.00

Risalah

Tiada Data

Atucara

Tiada Data


KURSUS JANGKA PENDEK (MODULAR) | Bersemuka

TERBUKA KEPADA ORANG RAMAI


KETERANGAN LANJUT / PERTANYAAN SILA HUBUNGI
NORAKMA BINTI NAWAWI

0379817495
norakmanawawi@jtm.gov.my


Kemaskini pada 2025-07-02 11:24:20

Carian Aktiviti