• Perform fitting works.
• Install mounting bracket/plate.
• Drill piping hole. Install piping system.
• Install indoor unit. Install outdoor unit.
• Install wiring system.
• Vacuum piping system.
• Perform leak test.
• Charge refrigerant.
• Record air-conditioning installation process.
ADTEC JTM KAMPUS KUALA LUMPUR
04/04/2026 (Saturday) / 08:00 AM
until
12/04/2026 (Sunday) / 04:30 PM
BAHAGIAN TEKNOLOGI RAC, ADTEC JTM KAMPUS KUALA LUMPUR
JALAN KUCHAI LAMA, KUALA LUMPUR
32 Jam
Hari Minggu
MYR850.00
No Data
No Data
KURSUS JANGKA PENDEK (MODULAR) | Face to Face
TERBUKA KEPADA ORANG AWAM
0379817495
nuradlina@jtm.gov.my
Update on 2026-04-13 10:18:02