• Perform fitting works
• Install mounting bracket/plate
• Drill piping hole
• Install piping system
• Install indoor unit
• Install outdoor unit
• Install wiring system
• Vacuum piping system
• Perform leak test
• Charge refrigerant
• Record air-conditioning installation process
• Maintain indoor motor.
• Maintain outdoor fan motor.
• Maintain compressor.
• Maintain evaporator/ cooling coil
• Maintain condenser coil.
• Maintain refrigerant.
• Maintain piping system
• Maintain wiring control system
• Maintain metering device
• Maintain drainage system
• Record air-conditioning maintenance activities
ADTEC JTM KAMPUS KUALA LUMPUR
24/01/2026 (Saturday) / 08:00 AM
until
15/02/2026 (Sunday) / 04:30 PM
BAHAGIAN TEKNOLOGI RAC, ADTEC JTM KAMPUS KUALA LUMPUR
JALAN KUCHAI LAMA, KUALA LUMPUR
40 Jam
Hari Minggu
MYR2,490.00
No Data
No Data
INSENTIF KHAS | Face to Face
TERHAD KEPADA PESERTA TERPILIH SAHAJA
Update on 2026-01-22 13:38:32