• Perform fitting works
• Install mounting bracket/plate
• Drill piping hole
• Install piping system
• Install indoor unit
• Install outdoor unit
• Install wiring system
• Vacuum piping system
• Perform leak test
• Charge refrigerant
• Record air-conditioning installation process
• Maintain indoor motor.
• Maintain outdoor fan motor.
• Maintain compressor.
• Maintain evaporator/ cooling coil
• Maintain condenser coil.
• Maintain refrigerant.
• Maintain piping system
• Maintain wiring control system
• Maintain metering device
• Maintain drainage system
• Record air-conditioning maintenance activities
ADTEC JTM KAMPUS KUALA LUMPUR
24/01/2026 (Sabtu) / 08:00 Pagi
hingga
15/02/2026 (Ahad) / 04:30 Petang
BAHAGIAN TEKNOLOGI RAC, ADTEC JTM KAMPUS KUALA LUMPUR
JALAN KUCHAI LAMA, KUALA LUMPUR
40 Jam
Hari Minggu
RM2,490.00
Tiada Data
Tiada Data
INSENTIF KHAS | Bersemuka
TERHAD KEPADA PESERTA TERPILIH SAHAJA
Kemaskini pada 2026-01-22 13:38:32