ILPKL Events Management System ilpKLEMS
poster
SINGLE PHASE AIR-CONDITIONING EQUIPMENT INSTALLATION
Permohonan Tertutup
Keterangan Aktiviti

  1. Perform fitting works.
  2. Install mounting bracket/plate.
  3. Drill piping hole.
  4. Install piping system.
  5. Install indoor unit. 
  6. Install outdoor unit.
  7. Install wiring system.
  8. Vacuum piping system.
  9. Perform leak test.
  10. Charge refrigerant.
  11. Record air-conditioning installation process. 


Penceramah
image
ASMAWATI BINTI SAID
PENOLONG PEGAWAI LATIHAN VOKASIONAL
image
SALAMIYAH BINTI ISMAIL
PENOLONG PEGAWAI LATIHAN VOKASIONAL
image
Norishidah binti Dahlan
PENOLONG PEGAWAI LATIHAN VOKASIONAL
image
Wan andro faizan bin wan mahmood
PENOLONG PEGAWAI LATIHAN VOKASIONAL
Anjuran

BAHAGIAN TEKNOLOGI RAC, ILP KUALA LUMPUR

Tarikh / Masa

04/05/2024 (Sabtu) / 08:00 Pagi
hingga
12/05/2024 (Ahad) / 03:30 Petang

Lokasi

ILP KUALA LUMPUR
JALAN KUCHAI LAMA, KUALA LUMPUR

Tempoh

32 Jam

Waktu Latihan

Hari Minggu

Bayaran

RM600.00

Risalah

Tiada Data

Atucara

Tiada Data


KURSUS JANGKA PENDEK (MODULAR) | Bersemuka

terbuka kepada orang awam


KETERANGAN LANJUT / PERTANYAAN SILA HUBUNGI
NUR ADLINA BINTI SAARY

0379817495
nuradlina@jtm.gov.my

SITI NORIDAYU BINTI MUSTAFAR

0379817495
sitinoridayu@jtm.gov.my


Kemaskini pada 2024-05-12 15:41:31

Carian Aktiviti